Listing of project work to be uploaded to this blog:
- Identified main shapes within building form
- Identified and discuss construction limitations
- Display roof forms and highlight path of exterior ramp/stair bridging the top and bottom of the cliff.
- Explore functionality of non-linear spaces and forms.
Thursday, 19 May 2011
Thursday, 12 May 2011
Project Update: Timeline
Timeline of Project work.
Week 11
- Identify and define internal and external spaces
- Familiarise internal spaces, and define ways of structuring building flows and pathing
- Further testing of spaces
Week 12
- Design individual internal spaces
- Familarise self with fly through camera controls
- Start thinking on materiality and contruction techniques
Week 13
- Finalise internal spaces
- Design outdoor spaces, reference previous design proposal
- Analyse design intent and restructure as neccessary.
Week 14
- Animations and Presentation
Week 11
- Identify and define internal and external spaces
- Familiarise internal spaces, and define ways of structuring building flows and pathing
- Further testing of spaces
Week 12
- Design individual internal spaces
- Familarise self with fly through camera controls
- Start thinking on materiality and contruction techniques
Week 13
- Finalise internal spaces
- Design outdoor spaces, reference previous design proposal
- Analyse design intent and restructure as neccessary.
Week 14
- Animations and Presentation
Subscribe to: